Phase 1

Making the Ankobra navigable, Prestea to the Atlantic

Our first project enables dependable, year-round navigation on the River Ankobra through targeted dredging, hydraulic structures, bridge works and navigation aids.

Scope of works

4 locks & weirs

Installed to allow year-round navigation, including through the dry season.

3 m navigation channel

Dredging the river to a dependable 3 m depth for barge traffic.

2 bridges rebuilt

Reconstructing two crossings that are currently too low for navigation.

Bank works & navigation aids

River training, quays and aids to make the corridor safe and reliable.

Where we are

EPA and Water Resources Commission permits are in place. Engineering design is being finalised, and construction is expected to begin next year.

  • EPA permit In place
  • Water Resources Commission permit In place
  • Engineering design (FEED) Being finalised
  • Construction start Expected next year